PackOS:

  • OEE Losses report extended 

Availability, Performance and Quality losses in OEE Losses report got now two more columns: Production loss which is calculated average performance in given time range multiplied by downtime duration, shown in line base unit and OEE loss which is downtime duration divided by whole Scheduled time, shown as a percentage.

OEE loss can have negative percentage value - then it’s treated as OEE gain

  • Possibility to choose more than 10 downtimes in Availability → Downtimes report


  • Manual way of working

Functionality from LogiX 2.x is brought back. Right now if this flag is set to true, users can make corrections of actual ongoing order without closing it!

MWoW.mov

Cockpit

In this version navigation through application has changed from clickable tiles to drawer functionality! By clicking on the menu on the left we can not only easily go to any line in active plant or to a different factory but also access Activities or Settings.

Screen Recording 2023-01-08 at 11.37.09.mov