It’s own state - IDLE, which triggered the root cause search
Reference to the root cause - failure on Capper
...
Let’s say the history looks like below:
...
The setting End ongoing downtime, is set on line level to some non-zero value. Base availability stopped in ‘Failure X’, and then started. The line remains in ‘Failure X’ as long as the production threshold is not met
...
Note that the line counts production using the ‘base quantity’ machine. There might be a significant delay between the end of stoppage on base availability, and the first count. Still, it’s very often useful to capture this delay as ‘downtime', because it includes the machine warmup which may be significant.
...